KONA CURVED GLASS SLIDING SHOWER DOOR KK005INSTRUCTION MANUALK-KA4Z - Kona
StepStep910 FIXED PANEL (2) ON BOTH SIDE GLASS SUPPORT (8) + SCREW ½” LG (8) GLASS SUPPORT GLASS AA1A2B INTERIORSHOWER SIDE INTERIORSHOWER SI
Step INSTALL DOOR PANELSPAGE 813AStep INTERIORSHOWER SIDE PUSH DOWN 13B INTERIORSHOWER SIDE INSERT DOOR PANELS INTO TOP & BOTTOM TRACK I
13C1314 StepStepUSE HEX NUT OR PLIERS FOR DRIVER VERTICAL DOOR ADJUSTMENT VERTICAL ADJUSTMENTINSTALL SIDE PANEL GASKET ONTO DOOR PANEL 1 (1)DOOR IN
INTERIORSHOWER SIDE SCREW 3/8” LG (8) + SCREW CAP (8) Step16ON BOTH SIDESDOOR INSTALLATION STEPSAB INTERIORSHOWER SIDE PAGE 1015INSERT EXPAND
(FOR ‘’ POINT ’’ GLASS ONLY)PARIS (FOR 6mm GLASS ONLY)OR SILICONE EXTERIOR OF ( BOTTOM TRACK + ALONG WALL JAMB) 17
Please keep this manual and product code number for future reference and replacement parts ordering if necessary.CURVED GLASS SLIDING SHOWER DOOR
INSTALLATION OVER CERAMIC TILEIf your shower door is to be installed over ceramic tile, tile should extend completely under bothwall jambs. Silicone s
PACKAGING CHECK LIST & HARDWAREPAGE 1FIXED PANEL (2)BOTTOM TRACK (1)TOP TRACK (1) WALL JAMB (2)EXPANDER (2)2134 DOOR PANEL (2)GLASS SUPPORT /L (
OOLS LISTPAGE 2PENCILDRILL MEASURE TAPELEVELSILICONPACKAGING CHECK LIST & HARDWARE1/8” DRILL BIT CERAMIC DRILL BIT TILE1/4”MA
DOOR INSTALLATION STEPS3Step4Step-POSITION AND CENTER THE FRAME TOGETHER WITH WALLJAMBS ONTO THRESHOLD OF SHOWER BASE.- ADJUST AND LEVEL THE FRAME ASS
Étape / StepEXPENDER (2) + TRACK (2) + SCREW 1 /3/8’’ LG (8)EXTENSEUR (2)+ RAIL (2) + VIS 1 3/8’’ LG (8)1ÉTAPES D’INSTALLATION DE LA PORTE / DOOR INST
5A5B6B6C6ADOOR INSTALLATION STEPS- INSERT THE WALL PLUGS (6) AND PUT IN EACH A DROP OF SILICONE.- SECURE THE WALL JAMB USING 1 3/8” SCREWS (6)Step6ON
8BPushPushSlideSlide8A INTERIORSHOWER SIDE SlidePushLrf reameowInsertStepINSERT ONE OF FRAME INTO WALL JAMBSIDE7StepENGAGE THE OTHER SIDE OF FRAM
Commenti su questo manuale